Drawing of Stakeholder map

Project Management, Project Planning, Templates and Advice

  • Concise, focused guide that cuts through the clutter
  • Step-by-step instructions for creating a project plan in under a day
  • Master essential skills like work breakdowns and task sequencing
  • Real-world troubleshooting for 20 common scheduling challenges
  • Rapidly get up to speed if you're new to Microsoft Project
  • Includes glossary, support resources, and sample plans
The cover of the book 'Essential Microsoft Project: The 20% You Need to Know'

Work breakdown structure for Planning Permission

by | reviewed 2024-04-22
This example work breakdown structure is from a project to get planning permission. Includes consulting with the planning officer, drawings required and submission of the planning application.
image of a WBS for getting Planning Permission Click image to zoom in.

View the WBS for planning permission as a list

Here is the breakdown as a list.
  • Planning permission
    • Consult
      • Tree officer
      • Planning officer
      • Local people
      • Check restrictions
    • Drawings
      • Site location plan
      • Block layout plan
      • Elevations
      • Roof plans
      • Cross sections
      • Site sections
    • Submission
      • Prep drawings
      • Create DVD
      • Complete application form
      • Fee

Download Planning Permission WBS

Visio diagram of the work breakdown

PDF version