Drawing of Stakeholder map

Construction Management, How to Guides and Advice

  • Concise, focused guide that cuts through the clutter
  • Step-by-step instructions for creating a project plan in under a day
  • Master essential skills like work breakdowns and task sequencing
  • Real-world troubleshooting for 20 common scheduling challenges
  • Rapidly get up to speed if you're new to Microsoft Project
  • Includes glossary, support resources, and sample plans
The cover of the book 'Essential Microsoft Project: The 20% You Need to Know'

Aircraft Work Breakdown structure (WBS) - FREE Download!

by | reviewed 2024-04-22
This is a three (3) level Work Breakdown Structure of an Aircraft System. By Mdd at en.wikipedia (Transferred from en.wikipedia) [Public domain], from Wikimedia Commons.

The WBS covers the aircraft, training, data, support equipment, site activiation, spares and industrial facilities.

Click image to zoom in.
image of a WBS for an Aircraft System

Mindmap version

This is an interactive version is made with Mindmeister an onine mindmapping tool. Make your own version of this mindmap.

Aircraft System

  • Air Vehicle

    • Airframe

    • Propulsion

    • Application Software

    • Communications / Identification

    • Navigation / Guidance

    • Central Computer

    • Fire Control

    • Data Display and Controls

    • Survivability

    • Reconnaissance

    • Automatic Flight Control

    • Central Integration Checkout

    • Antisubmarine Warfare

    • Armament

    • Weapons Delivery

    • Auxiliary Equipment

  • SE/Program Management

  • System T&E

    • DT&E

    • OT&E

    • Mockups

    • T&E Support

    • Test Facilities

  • Training

    • Equipment

    • Services

    • Facilities

  • Data

    • Technical Publications

    • Engineering Data

    • Support Data

    • Management Data

    • Data Depository

  • Peculiar Support Equipment

    • Test and Measurement Equipment

    • Support and Handling Equipment

  • Common Support Equipment

    • Test and Measurement Equipment

    • Support and Handling Equipment

  • Operations Site Activation

    • System Assembly, Installation and Checkout on site

    • Contractor Technical Support

    • Site Construction

    • Site / Ship Vehicle Conversion

  • Industrial Facilities

    • Construction / Conversion / Expansion

    • Equipment Acquisition or modification

    • Maintenance

  • Initial Spares and Initial Repair Parts

    • Work in progress (Specify by Allowance List, Grouping or H/W Element)

Download PDF version of this Aircraft System WBS

Aircraft System WBS FREE download in PDF